Challenges are Opportunities, Hard Work Results in Great Rewards.

VIEW PROJECT DOCUMENTS

Conrad’s Harley Davidson

Location
Shorewood, IL

The Carlson team was selected to provide construction management services for the construction of a new 78,000 square foot Harley Davidson dealership and factory service facility including all on and off site improvements.  The pre-cast concrete, glass, aluminum and steel facility was designed and constructed to showcase its dramatic Interstate 55 presence.

The factory service area included over 35,000 square feet divided into eighteen work areas for technicians. Power and exhaust connections were provided to each work station along with hydraulic lifts.

The show room featured specialty designed lighting fixtures to compliment the retail fixtures along with a gas forced air HVAC system with exposed duct work painted to create a corporate trademark look.  The floor system utilized a stained and polished concrete in a variation of colors.